top of page

PROFILE

Engr. Arslan Ahmed Amin is a practicing professional Electrical and Instrumentation Engineer serving Pakistan’s pioneer Oil and Gas Organization, Pakistan Petroleum Limited. He obtained his Bachelor's degree in Electrical Engineering from the prestigious University of Engineering and Technology, Lahore in 2010 and started his professional career with Pakistan Petroleum Limited. He has served this organization for more than 5 years and achieved lots of accomplishments in the development of the systems of newly installed 210 MMSCFD gas compression facility. He actively contributed his services in commissioning, testing, maintenance and upgradation of the E&I systems. He completed his Master’s in Business Administration (M.B.A.) in 2014 from Virtual University of Pakistan, Lahore through distance learning and afterwards obtained Masters (M.Sc.) in Electrical Engineering from University of Engineering and Technology, Lahore in 2015.

ELECTRICAL

  • Troubleshooting of Electrical Power Network for Complex Faults

  • Critical Study of Existing Electrical Power Network for Improvement

  • Motors and Drives Maintenance and Troubleshooting

  • LV / MV Switchgears Maintenance and Troubleshooting

  • Power Cables

  • Motor Starters

  • Control Logic and Ladder Development

  • Alternators Maintenance and Troubleshooting

  • UPS

  • Hazardous Areas Equipment Selection and Maintenance

  • Thermography by Thermal Imager

  • DMC-300

  • MATLAB

  • Power Simulink

  • ETAP

  • AutoCAD Electrical

 

INSTRUMENTATION

  • Critical Study of Process System for Improvements

  • Field Instrumentation Selection, Installation, Commissioning, Maintenance and Troubleshooting

  • PLC, DCS, ESD, SCADA, HMI

  • Compressor Control System, Series 3 Plus Controllers

  • Gas Turbine Control System

  • Vibration Monitoring System, BN 3500

  • Fire and Gas System

  • Control Systems Modification

  • Plant Automation

  • Control Valves and Actuators Maintenance and Troubleshooting

  • Pneumatic Instruments

  • Simatic Manager S-7

  • RS Logix 5000

  • HYSYS 8.0

  • PID Loop Tunning

  • Fox Boro V 10.0

  • Triconix V4.2

  • Intellimax Plant, PIMS

 

OTHERS

  • SAP(R3P Version), Microsoft Office, Excel, Visio

  • Inert Gas System (Ingersoll Rand)

  • RO Plant / Water Treatment Package (Al-Kauthar)

  • PABX System (Alcatel)

  • PAGA System (TOA Japan)

  • Flare System (Zeeco)

bottom of page